• CR1A Bridge near Buchtel

The design was completed in the fall of 2012 by RJM Engineering Company.  The Alan Stone Company, Inc. of Cutler, Ohio began construction of the bridge on County Road 1A – Happy Hollow Road in April 2014.  The existing steel truss bridge was replaced with a non-composite pre-stressed box beam bridge.  The new bridge was completed and opened on July 31, 2014 at an approximate cost of $400,000.