ATH-CR109-0.13/0.24 Landslide Repairs
Project Description:
This project involves constructing a drilled pier wall at CR109-0.13 and a drilled pier wall at CR109-0.24. The Engineer’s Estimate of Construction Cost for the project is $486,662.00.
Project Documents: