ATH-CR2-1.70 Box Culvert Project

Project Description:

This project involves removal of two 6′ diameter CMP culverts and construction of a 12’x8′ concrete box culvert. The Engineer’s Estimate of Construction Cost for the project is $335,000.00.

Project Documents:

Legal Notice

Bid Package

Plans

Bid Results