ATH-CR2/76-3.27/0.12 Landslide Repairs Project
Project Description:
This project involves constructing drilled pier walls at CR2-3.27 and CR76-0.12. The Engineer’s Estimate of Construction Cost for the project is $547,610.00.
This project involves constructing drilled pier walls at CR2-3.27 and CR76-0.12. The Engineer’s Estimate of Construction Cost for the project is $547,610.00.