ATH-CR20-4.95 Landslide Repairs Project (REBID)
Project Description:
This project involves constructing a drilled pier wall at CR20-4.95 on Strouds Run Road. The Engineer’s Estimate of Construction Cost for the project is $275,000.00.
This project involves constructing a drilled pier wall at CR20-4.95 on Strouds Run Road. The Engineer’s Estimate of Construction Cost for the project is $275,000.00.