ATH-CR20-4.95 Landslide Repairs Project
Project Description:
This project involves constructing a drilled pier wall at CR20-4.95 on Strouds Run Road. The Engineer’s Estimate of Construction Cost for the project is $225,988.00.
This project involves constructing a drilled pier wall at CR20-4.95 on Strouds Run Road. The Engineer’s Estimate of Construction Cost for the project is $225,988.00.