ATH-CR38/97-0.73/0.24 Landslide Repairs Project
Project Description:
This project involves constructing drilled pier walls at CR38-0.73 and CR97-0.24. The Engineer’s Estimate of Construction Cost for the project is $315,917.00.
This project involves constructing drilled pier walls at CR38-0.73 and CR97-0.24. The Engineer’s Estimate of Construction Cost for the project is $315,917.00.