ATH-CR89/94-2.14/0.29 Landslide Repairs
Project Description:
This project involves constructing a drilled pier wall at CR89-2.14 and a drilled pier wall at CR94-0.29. The Engineer’s Estimate of Construction Cost for the project is $277,224.00.
Project Documents: