ATH-TR153-2.33 Landslide Repairs Project
PROJECT DESCRIPTION:
This project involves constructing a drilled pier wall with plug piles at TR153-2.33. The Engineer’s Estimate of Construction Cost for the project is $210,500.00.
PROJECT DOCUMENTS: