2018 Projects

CR 24- Harmony Road Slip Repair

The following three 2018 featured slip repairs were a result of severe storms and flooding rains during late February/early March ...
Read More

CR 75- Coolville Ridge Road Slip Repair

As a result of severe storms and flooding rains during late February/early March 2017, Coolville Ridge Road developed a roadway ...
Read More

CR 37- Concord Church Road Slip Repair

As a result of severe storms and flooding rains during late February/early March 2017, Concord Church Road experienced a roadway ...
Read More

CR 15- Wood Road Bridge Replacement

The Wood Road bridge replacement project consisted of the installation of a 8' x 4' precast box culvert by Lindsay ...
Read More

CR 10- Baker Road Bridge Replacement

This 2018 Baker Road bridge replacement was surveyed, designed and built by the ACEO- the piling, prestressed concrete beams, paving ...
Read More

CR 73- Wolfe Bennett Road Motor Paving Project

Wolfe Bennett Road was paved using federal funding from the Eastern Federal Lands Access Program (EFLAP) with 20% local funds.  ...
Read More

CR 1- Kimberly Road Paving Project

In 2018, Kimberly Road was paved using funds from a RUMA Settlement with American Electric Power.  Construction Cost = $245,271 ...
Read More

CR 107- Burr Oak Road Paving Project

In 2018 the ACEO resurfaced a total of 7.1 miles of asphalt road that required significant repair prior to the ...
Read More