ATH-TR275-1.37 Box Culvert Project

Project Description:

This project involves removal of a 6′ diameter CMP culvert and construction of a 8’x7′ concrete box culvert. The Engineer’s Estimate of Construction Cost for the project is $135,000.00.

Project Documents:

Legal Notice

Bid Package

Plans

Addendum #1

Bid Results