This bridge design was completed in the fall of 2012 by RJM Engineering Company. The Alan Stone Company, Inc. of Cutler, Ohio began construction of the bridge on County Road 45 – King Road in March 2014. The existing steel truss bridge was replaced with a non-composite pre-stressed box beam bridge. The new bridge was completed in July 2014 at an approximate cost of $330,000.