ATH-CR57/75-0.93/5.29 Landslide Repairs
Project Description:
This project involves constructing a drilled pier wall at CR57-0.93 and a drilled pier wall at CR75-5.29. The Engineer’s Estimate of Construction Cost for the project is $466,955.00.
Project Documents:
Bid Results