ATH-TR275-1.37 Box Culvert Project
Project Description:
This project involves removal of a 6′ diameter CMP culvert and construction of a 8’x7′ concrete box culvert. The Engineer’s Estimate of Construction Cost for the project is $135,000.00.
Project Documents:
Bid Results