ATH-TR315-0.01 Bridge Replacement
Project Description:
This project involves replacing the bridge at ATH-TR315-0.01 with a three span continuous reinforced concrete slab bridge with capped pile piers and capped pile abutments. The Engineer’s Estimate of Construction Cost for the project is $997,676.42.
Project Documents:
Bid Results