In mid-July 2019 Shelly and Sands, Inc. began work on two slip repairs on County Road 109- Beebe Road. This featured slip repair at the 0.24 mile marker consisted of removal and replacement of 13 CY of gravel, 161 CY of embankment, the installation of 135 LF drilled shaft wall, the placement of 200 CY of rock fill and the installation of 150 LF of guardrail.  The total construction cost of this particular project was $237,547.