In September 2016, Nuko Paving began a 3 mile asphalt paving project on East Scatter Ridge Road. The project consisted of 5 miles of cement base stabilization performed by ACEO and Reumac. The total project cost was $561,703.35, the construction portion was $507,119.60, $400,000 of which was paid through an OPWC Issue 1 Grant.