• Before construction
  • After construction
  • After construction

The surveying, site planning and ROW (right-of-way) plans for this bridge replacement project on South Canaan Road were performed by the ACEO.  The bridge was constructed by DGM Inc. with a final construction cost of $213,516 which was funded by ODOT.