This particular bridge replacement project was surveyed, designed and constructed by the ACEO. We replaced a concrete slab bridge with a 12′ x 8′ concrete box culvert. The total construction cost was $167,437, $89,500 of which was funded through an OPWC (Ohio Public Works Commission) grant.