The surveying, site planning and ROW (right-of-way) plans for this bridge replacement project on Rock Riffle Road were performed by the ACEO. The bridge was constructed by DGM Inc. with a final construction cost of $210,360.
The surveying, site planning and ROW (right-of-way) plans for this bridge replacement project on Rock Riffle Road were performed by the ACEO. The bridge was constructed by DGM Inc. with a final construction cost of $210,360.