This project was part 3 of the ATH-CR20/VAR Landslide Repairs Project. The project was located on CR 25- Rock Riffle Road, just south of the Stimson Avenue intersection (near Pallini Industries). This project was surveyed and designed by the assistant engineer, Donnie Stevens. It consisted of a 128′ long drilled shaft pier wall the final construction cost of $135,009. The FHWA (Federal Highway Administration) Emergency Grant paid for 80% of the construction costs.