In Spring 2016, Parker Corporation began a slip repair project on Diamond Brick Road at the 1.57 mile marker.  They were the low bid on the project at $117,483.07.  The slope reconstruction method was used to repair this slip using rock channel protection.  The project was surveyed and designed by the ACEO and was ODOT emergency funded (80/20).