• Before construction
  • After construction

In late July 2019 the Alan Stone Company began a slip repair on County Road 75- Coolville Ridge Road. This project consisted of the removal and replacement of 300 SY of chip and seal road surface, the installation of 115 LF of drilled shaft wall with lagging, the repair of 6 CY asphalt base course, the replacement of 21 CY embankment material, the installation of 4 CY Type C rock channel protection.  The total construction cost of this project was $102,629.