In early May 2019 county crews began work on a bridge replacement on Salem Road. The 8’ x 4’ precast concrete box culvert was designed and installed by Lindsay Precast. The total cost of the project came to $94,288.
In early May 2019 county crews began work on a bridge replacement on Salem Road. The 8’ x 4’ precast concrete box culvert was designed and installed by Lindsay Precast. The total cost of the project came to $94,288.