In mid-April 2019 county crews began work on a box culvert replacement project on Wildman Road in Troy Township.  The old box culvert had exceeded its useful life decades ago.  After the old bridge was removed we excavated and hammered out the rock bottom then formed and poured concrete footers and placed a limestone sub-grade between footers.  The 8’ x 4’ precast concrete box culvert was designed and installed by Lindsay Precast.   The total cost of the project came to $94,526.