• Before construction
  • After construction

Dover Township’s Hamley Run Road bridge Replacement was surveyed, designed and built by the ACEO.   Surveyed, Designed, and built by ACEO.  The crews removed existing bridge and constructed 8’ x 8’ x 48’ box culvert.  Th total construction cost came to $181,960.21.