Dover Township’s Hamley Run Road bridge Replacement was surveyed, designed and built by the ACEO. Surveyed, Designed, and built by ACEO. The crews removed existing bridge and constructed 8’ x 8’ x 48’ box culvert. Th total construction cost came to $181,960.21.