• Before construction
  • Box culvert installation
  • After construction

In June 2019 county crews began work on a bridge replacement on Waterloo Township’s Gun Club Road. The 10’ x 5’ precast concrete box culvert was designed and installed by Scioto Valley Precast. The total cost of the project came to $93,083.