• Before construction
  • After construction

The surveying, site planning and right-of-way width plans for this bridge replacement project on Ames Township Road 343 were done by the ACEO.  DGM Inc constructed the bridge and the final construction cost was $357,023 which was funded by the Ohio Department of Transportation.