• Before Construction
  • Pavement Repair Section
  • 3” Asphalt Resurfacing Complete

In 2018 the ACEO resurfaced a total of 7.1 miles of asphalt road that required significant repair prior to the asphalt overlay. Burr Oak Road was paved using federal funding from the Eastern Federal Lands Access Program (EFLAP) with 20% local funds.  This project was bid out to Nuko Paving with the total construction cost of $191,970 for 1.0 mile paving.